Y-Splitting A Load
1.) Add the location where you’re your drivers will be swapping. Return to your name screen and Select Dispatch -> Master Files - > Locations -> Add Location.
​
​
​
​
​
​
​
​
​
​
​
​
​
​
2.) Once you have added your location you need to then Y split the load. Open up the load in progress the load the needs to be Y split and Select Movements.
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
3.) Add you location on the Split Screen. Then you must select the time frame that the Y Split will be occurring and the actual arrival and departure of the Y Split then select okay.
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
4.) On your dispatch planning screen a load will appear with a “Y” next to it. The load will then be able to be assigned to another truck and be dispatched.
​
​
![](https://static.wixstatic.com/media/07fdf7_f94bb318e1ef41ac882ffcd4f01b504c~mv2.png/v1/fill/w_760,h_624,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/07fdf7_f94bb318e1ef41ac882ffcd4f01b504c~mv2.png)
![](https://static.wixstatic.com/media/07fdf7_0d36c488d719449eb61d036b30ec7e0d~mv2.png/v1/fill/w_760,h_574,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/07fdf7_0d36c488d719449eb61d036b30ec7e0d~mv2.png)
![](https://static.wixstatic.com/media/07fdf7_f5a856699cb34ea594245bdfb22632d6~mv2.png/v1/fill/w_929,h_57,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/07fdf7_f5a856699cb34ea594245bdfb22632d6~mv2.png)
![](https://static.wixstatic.com/media/07fdf7_f94bb318e1ef41ac882ffcd4f01b504c~mv2.png/v1/fill/w_760,h_624,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/07fdf7_f94bb318e1ef41ac882ffcd4f01b504c~mv2.png)